The Arizona Department of Transportation begins a project to repave a 10-mile of Interstate 17 between the State Route 169 traffic interchange and the Orme/Dugas exit (mileposts 269 to 279).
Work begins Sunday, April 27 at which time drivers can expect a nightly single lane restriction on northbound I-17 just south of the SR 169 traffic interchange from 8 p.m. to 6 a.m. through Friday morning, May 2.
In addition to the work on I-17, ADOT will perform bridge work on the SR 169 bridge, during that time drivers using the SR 169 bridge will be restricted to one lane and guided through work zone with a pilot car.
This $6.4 million project consists of the removal of a layer of the existing pavement, repaving the roadway, bridge work and guardrail replacement and is expected to be complete by the fall 2014.
The work zone will be clearly marked by temporary barricades and signage. ADOT advises drivers to allow additional time to reach their destinations and to proceed through the work zone with caution, comply with the reduced speed limit, and be alert for construction equipment and personnel.