Traffic to switch to new alignment on US 89 in conjunction with opening of new roundabout at the US 89/SR 64 junction north of Flagstaff

The Arizona Department of Transportation will be switching traffic for both north- and southbound travel on US 89 in Cameron during the morning hours on Tuesday, Dec. 2, to allow for construction to continue on the roadway and bridge project currently underway.

Traffic will be diverted onto the new alignment directly adjacent to the existing US 89 through the community of Cameron, approximately 50 miles north of Flagstaff. In addition to switching traffic to the new alignment, the recently completed roundabout at the US 89/State Route 64 junction will also be opened.

These improvements are part of a project which includes widening US 89 to two lanes in each direction between SR 64 and the Little Colorado River, replacement of the existing US 89 Cameron truss bridge and installation of a roundabout, with new lighting and pedestrian facilities throughout the project area. Travel will continue on the existing bridge while the new bridge is being constructed. The roadway and bridge improvement project is expected to be completed in fall 2016.

Traffic delays may occur during construction with traffic reduced to one lane. There will be directional signage and flaggers present during construction. ADOT advises motorists to be alert for construction equipment and personnel, and to proceed through the work zone with caution.