Traffic shift scheduled Tuesday on SR 89 at Road 4 North in Chino Valley

CHINO VALLEY — Motorists traveling along State Route 89 in Chino Valley need to be aware of a traffic shift that will occur on Tuesday, May 26 as the Arizona Department of Transportation continues constructing the new roundabout at the intersection at Road 4 North.

Traffic will be shifted from the east side to the west side of SR 89 at Road 4 North in Chino Valley and the new configuration will be in place for the next three months.

The work zone will be clearly marked by temporary barricades and signage. ADOT advises drivers to be aware of the new alignment, allow additional travel time to reach their destinations and be alert for construction equipment and personnel. Weather can affect a project schedule.

This $2.1 million project consists of a new roundabout at the intersection of SR 89 and Road 4 North between mileposts 330-331. Additional work includes removal and replacement of existing pavement, drainage improvements, new pavement markings and lighting.

This project is expected to be complete by August.

MESA: Proposed Arizona Pollutant Discharge Elimination System (AZPDES) Renewal Permit

Pursuant to the Clean Water Act and in accordance with Arizona Administrative Code (A.A.C.) R18-9-A907, the Director of the Arizona Department of Environmental Quality (ADEQ) proposes to issue an Arizona Pollutant Discharge Elimination System (AZPDES) Permit to discharge pollutants to Waters of the United States to the following applicant, subject to certain effluent limitations and special conditions:

Public Notice No. 15-58                                                      Published on May 21, 2015
Published in East Valley Tribune

AZPDES Permit No. AZ0025241
City of Mesa Water Resources
Greenfield Water Reclamation Plant (GWRP)
P.O. Box 1466
Mesa, Arizona 85211-1466

The City of Mesa applied for a renewal AZPDES permit for the proposed discharge of up to 16 million gallons per day (mgd) of from the GWRP to the East Maricopa Floodway, tributary to the Gila River in the Middle Gila River Basin in Township 2 S, Range 6 E, Section 15, in Maricopa County, Arizona. The GWRP is a publicly owned treatment works that receives domestic wastewater from residential, commercial, and industrial sources in the City of Mesa and the Towns of Queen Creek and Gilbert. Sludge is treated on-site and then either hauled by a licensed contractor to the Apache Junction Landfill or land applied as Class B Biosolids, with the back-up capability to pump and discharge to the Baseline Interceptor and send to the City of Phoenix 91st Avenue WWTP for treatment.

The permit and fact sheet may be viewed online at http://www.azdeq.gov/cgi-bin/vertical.pl by typing the permit number in the box left of “Search Event”. The public notice and related documentation also are available for public review, Monday through Friday, 8:30 a.m. to 4:30 p.m., at the ADEQ Records Center, 1110 W. Washington St., Phoenix, Arizona, 85007. In Phoenix, please call (602) 771-4380 or e-mail recordscenter@azdeq.gov 24 hours in advance to schedule an appointment to review the file.

Persons may submit comments or request a public hearing on the proposed action in writing, to Jacqueline Maye, Arizona Department of Environmental Quality, Water Quality Division, 1110 W. Washington St., 5415B-3, Phoenix, Arizona 85007. All written comments received by ADEQ by the close of business on the date 30 days after publication of this notice will be considered in the final permit decision. A public hearing request must be in writing and must include the reasons for such request. If there is a significant degree of public interest, the Director will hold a hearing in accordance with A.A.C. R18-9-A908(B).