Maintenance scheduled Wednesday, Oct. 26, on southbound Interstate 17 near Table Mesa Road and New River

The Arizona Department of Transportation will perform routine pavement maintenance between 6 a.m. and 5 p.m. Wednesday, Oct. 26, on southbound I-17 in two locations:

Between mileposts 237 and 236, near Table Mesa Road; and
Between mileposts 233 and 232 near New River

Minimal delays are expected during work hours. The speed limit through the work zones will be reduced to 45 mph during work hours. Drivers should proceed through the work zone with caution, slow down and watch for construction equipment and personnel.

ADOT works to inform the public about planned highway restrictions, but it’s possible that unscheduled closures or restrictions might occur because of weather or other factors. For the latest highway conditions around the state, visit the ADOT Traveler Information Center at www.az511.gov or call 511, except while driving.