FLAGSTAFF – Interstate 17 south of Flagstaff will be narrowed to one lane from 6 a.m. to 4:30 p.m. Monday, May 22, for paving. Work is scheduled to occur between mileposts 340 and 338.
Drivers should proceed through the work zone with caution, slow down and watch for construction personnel and equipment.