MVD and feds partner to make E-Verify more secure

PHOENIX – The E-Verify process just got more secure for Arizona employers.

The Arizona Department of Transportation Motor Vehicle Division has signed an agreement with the U.S. Department of Homeland Security (DHS) that makes it possible for DHS to verify the validity of driver’s license and ID cards against the MVD database.

The Records and Information from DMVs for E-Verify (RIDE) initiative is an enhancement to E-Verify that verifies the validity of driver’s license and ID card information by matching the data entered by employers against participating state motor vehicle department records. Approximately 80 percent of E-Verify cases use a driver’s license or ID card as proof of identity, making RIDE a critical tool to the program. With this agreement, when an employee presents an Arizona driver’s license or ID card for Form I-9, Employment Eligibility Verification during the hiring process, E-Verify employers will now have the added benefit of confirming that identity document issued by the MVD is genuine. The employer does not see the MVD record, but will receive a match or no match response from E-Verify.

E-Verify is an Internet-based system that compares information from an employee’s Form I-9 to data from DHS and Social Security Administration records to confirm employment eligibility. Additional partnerships such as RIDE allow for the verification of other documents which are acceptable for the Form I-9 process. RIDE enables two-part verification by validating the information on select identity documents issued by the Arizona MVD in addition to the existing employment authorization check.

“The Arizona Motor Vehicle Division joined this partnership to help employers gain added assurance that their newly hired employees meet the guidelines required by federal law,” said MVD Director Eric Jorgensen. “We’re very pleased to help streamline this process for Arizona employers.”

For more information about E-Verify and RIDE, visit www.uscis.gov/e-verify

For more information about MVD, visit azdot.gov/mvd.

State Transportation Board OKs contract for ADOT wrong-way detection system

PHOENIX – Construction of a first-in-the-nation system to detect wrong-way vehicles and alert law enforcement and other drivers is scheduled to begin in early August following State Transportation Board approval of the contract for installation.

At the direction of Governor Doug Ducey, the Arizona Department of Transportation has accelerated the start of construction on the $3.7 million pilot project along 15 miles of Interstate 17 in Phoenix. That includes pre-ordering materials, including thermal cameras that will detect wrong-way vehicles as well as poles and fiber-optic cable, rather than waiting for a contractor to secure those items.

On Friday, the State Transportation Board conditionally approved a $1.89 million bid from Contractors West Inc. of Mesa to install the system.

Construction is scheduled to begin in early August, a month sooner than earlier project estimates. Installation and testing are expected to be completed by early next year.

The system will use thermal cameras to detect a wrong-way vehicle along an off-ramp, triggering an illuminated wrong-way sign with flashing lights aimed at getting the attention of the driver. The system will immediately alert the Arizona Department of Public Safety and ADOT while warning other freeway drivers in the area through overhead message boards. On the freeway, additional thermal cameras placed at one-mile intervals will signal when a wrong-way vehicle passes to help State Troopers plan their response.

While ADOT and the DPS react quickly to reports of wrong-way drivers, the response right now usually begins with 911 calls from other motorists.

The I-17 pilot system will speed notification, but it can’t prevent wrong-way driving, which in most cases involves impaired drivers. ADOT and partner agencies, including DPS and the Governor’s Office of Highway Safety, continue to study other potential responses to reduce the risk from wrong-way driving.

Paving scheduled on Interstate 40 near Interstate 17 junction next week

FLAGSTAFF – Motorists traveling eastbound on Interstate 40 to Flagstaff should allow extra time while paving continues near the I-17 junction. Paving is scheduled from 2 a.m. to noon both Tuesday, August 8, and Wednesday, August 9. A single-lane restriction will be in place to accommodate work between mileposts 195 and 197, located one mile west of Butler Avenue.

Drivers should use caution and watch for construction personnel and equipment while paving is underway.

Schedules are subject to change based on weather and other unforeseen factors. For more information, call the ADOT Project Information Line at 855.712.8530 or email Projects@azdot.gov. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.