Kaibab National Forest seeks public input on a proposed landscape-scale forest restoration project across much of the North Kaibab Ranger District

WILLIAMS – The Kaibab National Forest is seeking public input and comments on a proposed project to reduce the threat of uncharacteristic, high-intensity wildfire and to restore the structure, species composition and function of ecosystems on the Kaibab Plateau.

The project, known as the Kaibab Plateau Ecological Restoration Project, is designed to increase resiliency and overall health of vegetation and watersheds and to restore low-intensity fire to the fire-adapted ecosystems of the area. Specifically, the proposed action includes prescribed fire and non-commercial, mechanical vegetation treatments on about 511,000 acres of the North Kaibab Ranger District of the Kaibab National Forest.

Most of the Kaibab National Forest’s vegetation is adapted to recurring wildfires, and fire naturally plays a vital role in maintaining ecosystem health. The condition and structure of the project area’s forests, woodlands, shrublands and grasslands have changed dramatically from natural conditions, in large part because fire has been excluded due to decades of successful fire suppression efforts. Today, the project area contains uncharacteristically dense forests with many more young trees than were present historically, and climate change is making them vulnerable to more frequent high-intensity wildfires.

The project is intended to address those changed conditions by implementing prescribed fire and non-commercial, mechanical vegetation treatments. Prescribed fire would include broadcast burning and pile burning to reduce fuel levels and tree densities, control conifer regeneration, and promote understory plant vigor. Mechanical treatments would include pruning ladder fuels, mastication, chipping and thinning to remove smaller trees with the goal of protecting larger or older trees by targeting understory and ladder fuels.

The Kaibab National Forest encourages public participation in the development of proposed projects and is seeking input and comments on the Kaibab Plateau Ecological Restoration Project. Specific, written comments should be received no later than Nov. 5.

Comments must be in writing and may be delivered electronically, in person, or by mail or facsimile. Electronic comments, including attachments, may be emailed to comments-southwestern-kaibab-north-kaibab@fs.fed.us. Please include “Kaibab Plateau Ecological Restoration Project” in the subject line. Comments may be submitted electronically in Word (.doc or .docx), rich text format (.rtf), text (.txt), Adobe portable document formats (PDF), or HyperText Markup Language (.html). Submit comments via hand delivery (Monday through Friday, 8 a.m. to noon, 1 p.m. to 4 p.m., excluding holidays) or mail to: U.S. Forest Service, Kaibab National Forest, Attn: Sue Farley, 800 South 6th Street, Williams, AZ 86046. Send comments via facsimile to 928-635-8280.

For detailed project information, including the full proposed action document, please visit www.fs.usda.gov/project/?project=54226. For questions, please contact Sue Farley, environmental coordinator for the Kaibab National Forest, at 928-635-8331 or sfarley@fs.fed.us.

A detailed Kaibab Plateau Ecological Restoration Project area map is included on the next page.

Kaibab National Forest information is also available through the following sources:

Kaibab National Forest Website: www.fs.usda.gov/kaibab
Twitter: www.twitter.com/KaibabNF
Facebook: www.facebook.com/KaibabNF
Flickr (photos): http://bit.ly/KaibabNFPhotos

NPS seeking public comment to control nonnative species near Glen Canyon Dam

PHOENIX – The National Park Service is seeking public comment on an Expanded Nonnative Aquatic Species Management Plan and Environmental Assessment in Glen Canyon National Recreation Area, including Lees Ferry, and Grand Canyon National Park below the Glen Canyon Dam.

Public comments will be accepted through October 11.

The plan would expand the tools used in controlling nonnative fish in Lees Ferry and the Grand Canyon.

NPS is hosting a variety of meetings to present plan information, including a public webinar on Thursday, September 20 from 5 to 6 p.m. Arizona time. Call line: 888-790-2024; passcode: 9535626; web address: https://bluejeans.com/7293338944/.

Open houses also will be held September 25-27 at the following locations:

September 25, 6-8 p.m.: Glen Canyon National Recreation Area Headquarters, 691 Scenic View Drive, Page, Ariz.
September 26, 6-8 p.m.: Flagstaff Aquaplex, 1702 N. Fourth Street, Flagstaff, Ariz.
September 27, 6-8 p.m.: Arizona Game and Fish Department, Eagle Room, 5000 W. Carefree Highway, Phoenix. See more information.

AZGFD seeks public input on dedicated funding source for outreach, education and public awareness

AZGF Photo

PHOENIX — The Arizona Game and Fish Department (AZGFD) is still seeking ideas for establishing and maintaining a discretionary, dedicated funding source for outreach, education and public awareness efforts.

To view ideas received to date, or to submit ideas throughout the 30-day public input period that ends September 8, visit https://www.azgfd.com/agency/dedicated-funding-source/. Ideas also can be emailed to: ideas@azgfd.gov.

Draft funding alternatives, based on this public input, vetting and benchmarking, will be presented to the Arizona Game and Fish Commission during its public meeting September 21 at the Navajo County Heber Complex, 2188 W. Country Club Drive, in Overgaard.

There will be an additional opportunity for the public to provide input on select alternatives, based on Commission direction. AZGFD will host a public forum and webcast at 6 p.m. October 10 at department headquarters (Quail Room), 5000 W. Carefree Highway, Phoenix. The public will be able to ask questions or provide comments in person during the forum in the Quail Room, or by email from their smartphone or other device. The webcast also can be viewed at any AZGFD regional office, where the public also can submit their questions or comments via email.

The forum will kick off another 30-day comment period that ends November 8. AZGFD then will present potential funding option(s) to the Commission at its public meeting December 7 in Phoenix.

Webcast on dedicated funding source for outreach, education and public awareness now available online

PHOENIX — The Arizona Game and Fish Department is seeking public input on ways to establish and maintain a discretionary, dedicated funding source for outreach, education and public awareness efforts.

A webcast can be viewed at https://youtu.be/pWzMi2o8sEE. All ideas can be submitted by email through Sept. 8 at: ideas@azgfd.gov. Note: Only ideas related to the topic of establishing a funding source will be considered.

Draft alternatives, based on this public input, vetting and benchmarking, will be presented to the Arizona Game and Fish Commission during its public meeting September 21 at the Navajo County Heber Complex, 2188 W. Country Club Drive, in Overgaard.

For more information, including frequently asked questions (FAQs), visit https://www.azgfd.com/agency/dedicated-funding-source/.

Public encouraged to participate in May 10 open house for Milton Road Corridor Master Plan

FLAGSTAFF – The Arizona Department of Transportation will host a public open house for the Milton Road Corridor Master Plan from 6 to 8 p.m. Thursday, May 10, 2018 at the Flagstaff High School Commons, 400 W. Elm Ave, in Flagstaff.

Everyone is encouraged to attend, ask questions and provide input. Visit the project website for more information.

Public encouraged to participate in May 3 open house for US 180 Corridor Master Plan

FLAGSTAFF – The Arizona Department of Transportation will host a public open house for the US 180 Corridor Master Plan from 6 to 8 p.m. Thursday, May 3, 2018 at the Flagstaff High School Commons, 400 W. Elm Ave, in Flagstaff.

Everyone is encouraged to attend, ask questions and provide input. Visit the project website for more information.

ADOT seeks input from public on corridor master plan studies for US 180, Milton Road

FLAGSTAFF – As the Arizona Department of Transportation studies and develops long-term visions for two major Flagstaff corridors, the agency will hold public meetings on the first two Thursdays in May to solicit input.

The public meeting on the US 180 Corridor Master Plan will be from 6 to 8 p.m. Thursday, May 3, at the Flagstaff High School Commons, 400 W. Elm Ave. ADOT will also host a public meeting for the Milton Road Corridor Master Plan from 6 to 8 p.m. Thursday, May 10, at the same location.

Both meetings will begin with a brief presentation, followed by an open house during which the public can talk with ADOT representatives.

Each corridor master plan will set a 20-year vision for US 180 and Milton Road with suggested projects aimed at improving traffic flow and maintaining safety.

US 180, the primary route between Flagstaff and Arizona Snowbowl and other snow-play areas, has seen heavy traffic during winter weekends. The study area for US 180 runs from the intersection of Humphreys Street and Route 66 to the Crowley Pit at milepost 233.

Milton Road, also known as State Route 89A, is the primary roadway through the heart of Flagstaff. It sees traffic delays during weekday rush hours and experiences backups during winter weekends.

The study area for Milton Road runs from Forest Meadows Street near the southern entrance to Flagstaff to the point where Milton turns into Route 66 at Butler Avenue and goes to Beaver Street.

For more information on these important studies, visit azdot.gov.

ADEQ Public Comment period for proposed plan for municipal Solid Waste Landfills.

The Air Quality Division of the Arizona Department of Environmental Quality (ADEQ) welcomes comments on the proposed Clean Air Act Section 111(d) plan and amendments to the Arizona Administrative Code, R18-2-731 and R18-2-901, pertaining to municipal solid waste landfills.

Arizona proposes to submit the proposed plan and rules to the Environmental Protection Agency to establish standards of performance for landfills located within ADEQ’s jurisdiction. The proposed amendments to R18-2-731 and R18-2-901 incorporate by reference new federal rules (codified at 40 CFR Part 60, Subpart Cf and 40 CFR Part 60, Subpart XXX).

Interested parties can find ADEQ documents here.

Public Comment Period:
March 16, 2018 to April 16, 2018

Public Hearing:
Monday, April 16, 2018 at 1:00 p.m.
1110 W. Washington St., Rm. 3100A
Phoenix, AZ 85007

Comments may be submitted as follows:
Email: toon.elias@azdeq.gov
Fax: (602)-771-2299
Mail: (Must be postmarked or received by April 16, 2018)

ADEQ
Attn: Elias Toon
Air Quality Division, Air Quality Improvement Planning Section
1110 W. Washington St.
Phoenix, AZ 85007

Comment today on ADOT’s Tentative Long-Range Transportation Plan

The public and agencies across the state have until December 21 to comment on the Arizona Department of Transportation’s Tentative Long-Range Transportation Plan.

The plan, which is updated every five years, outlines strategies for meeting the state’s highway and bridge needs over the next 25 years. The CiviComment online tool, which is available on the project website, allows users to comment on the full report or comment on individual pages pulled from the document. The direct link to CiviComment is whatmovesyouarizona.civicomment.org.

ADOT spent the past two years drafting this update to the Long-Range Transportation Plan, which looks through 2040. The project team conducted stakeholder outreach, gathered extensive public comment across the state and worked through months of technical analysis.

During the 25-year period of this draft plan, about $923 million in annual highway capital funding will be available from state and federal sources. On average, the Phoenix and Tucson regions are expected to receive $512 million annually. Of that, $223 million comes from voter-approved regional programs in those two metropolitan areas dedicated largely to highway expansion. ADOT’s Recommended Investment Choice calls for all of the remaining annual average of $411 million to go toward preserving and modernizing highways in Greater Arizona.

The recommendation outlined in the Tentative Long-Range Transportation Plan is in line with public and stakeholder outreach, in which most participants listed preservation, safety and modernization projects as their highest priorities for Greater Arizona.

The Long-Range Transportation Plan is expected to be finalized in early 2018.

Comments can also be sent to:

ADOT Project Information Line: 1.855.712.8530
Mail:

Long-Range Transportation Plan
c/o ADOT Communications
1655 W. Jackson St., Mail Drop 126F
Phoenix, AZ 85007

ADOT seeks input on I-15 Virgin River Bridge No. 1 rehabilitation project

Virgin River Bridge #6 – ADOT Photo

PPHOENIX – The Arizona Department of Transportation is seeking input from community members on a bridge rehabilitation project along Interstate 15 in the Virgin River Gorge with a public hearing on November 29 in Littlefield.

Those attending the hearing, to be held from 6 to 8 p.m. at the Beaver Dam Lodge, 452 Old Highway 91 North, can review and comment on the draft environmental assessment for the bridge project. A formal presentation is scheduled from 6 to 6:30 p.m.

The hearing will present three issues identified with Bridge No. 1 along I-15 through the Virgin River Gorge as well as a preferred design solution to replace the bridge and widen the roadway shoulders.

The draft environmental assessment, which is available for review through Dec. 14, can be reviewed online at www.azdot.gov/i15ea and at the following locations during business hours:

Mesquite Library, 121 W. First North Street, Mesquite, Nevada
Washington County Library-St. George Branch, 88 W. 100 South Street, Street George, Utah
Beaver Dam Lodge, 452 Old Highway 91 North, Littlefield, Arizona

Outside of the public hearing, community members can provide comments on the draft environmental assessment through the following ways:

  1. In writing: I-15, Bridge 1, 101 N. First Avenue, Suite 2600, Phoenix, AZ 85003
  2. Online: www.azdot.gov/VRB1Comments
  3. Email: projects @adot.gov
  4. Phone: 855.712.8530